Following acceptance of a proposal a formal handover is made to the UKPS in house design department. A dedicated and experienced designer will work closely with you to ensure the installation meets their needs whilst adhering to the strict regulations of accrediting bodies and specifications required for adoption by the DNO.

Experienced

Our design team has knowledge and experience in every type of connection. From Industrial & Commercial connections such as Cribbs Causeway, to Residential projects such as The Mall. From Renewable connections such as the Spring Farm aerobic digestion facility, to iconic tourist attractions such as The Cutty Sark. UKPS has a diverse and demonstrable knowledge base allowing the design of bespoke connection solutions to suite any project.

Details of these projects can be found in our case studies:

Bespoke

No two projects are the same, and no two projects require the same connection. We don’t have off-the-shelf designs because we believe in providing the best possible solution for each project. We work hard at the design stage to find the right solution to your project to enable a seamless delivery and working relationship.

Always Contactable

Unlike many other connection providers we have our own in house design team. This not only makes it easier for the customer to discuss design changes with us but also our project managers relay changes resulting from site meetings back to our design team quickly.

Accredited

As a fully accredited member of the National Electricity Registration Scheme (NERS), UKPS combine a wealth of experience with the necessary certification to design and construction networks ready for adoption by the Distribution Network Operator.